Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Rays of Light
Despite bitterly cold weather Colin and the crew have managed to prepare the beams and post to start the roof next week.

   
  January 20, 2001 - Rays of sunlight, photons, warp the image as they pass through the super-structure of the house. Ian stands as a statued to the left, hands in his jacket to keep warm.  
   
  January 20, 2001 - Grass will soon grow from the roof and be clearly visible from this angle.  
   
  January 20, 2001 - Half of the roof joists are now in place, ready to hold the heavy loads of a green roof, 8 inches of soil with native grasses growing. No maintenance will be required.
   
  January 20, 2001 - Light shines through the large clerostery in the middle of the roof.  
   
  January 20, 2001 - The joists visible frame the large clerostery that will stand up above the main roof line.  
   
     
     
   
     
  Copyright 2000 John Wilson