Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Roof Done, Ready for Windows
The EPDM waterproof membrane is done, the roof is sealed and waterproof, and the window frames have been prepared for the Windows to arrive.

   
  March 24, 2001 - The waterproof membrane now seals the entire roof. The additional membranes and soil will be applied later as the weather improves however the EPDM is sufficient to complete the roof. The window frames have been prepared for the InLine fiberglass windows to arrive on Monday. All windows should be installed by the end of next week.  
   
  March 24, 2001 - The master bedroom walls internally have been completed and the window frames are ready for installation.  
   
  March 3, 2001 - The entire roof now has the EPDM layer applied which completes the waterproofing for the roof. This industrial material is enough to complete the roof until we have time to apply the additional layers and soil.  
   
     
     
     
     
   
     
  Copyright 2000 John Wilson