Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Warm and Cozy
The spare bedroom provides a cozy place for Leigh and John while the master bedroom is still under construction.

   
  June 17, 2001 - The spare bedroom on the second floor. Windows are still covered with poly plastic sheets to keep the rain out until the windows is set in it's final place.  
   
  June 17, 2001 - The kids bedrooms have had the final flooring installed. In order to keep costs down and provide a warm and comfortable floor we've used standard plywood with a water based verathane. Under the floor is a concrete pad with the in-floor water tubing system which will provide heating in the winter.  
   
     
   
     
     
     
     
     
     
     
     
     
     
     
 
 
     