Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Walkout Basment
The ground floor joists are in and the basement takes shape. Exentsive use of natural light is provided by windows and openings into the basement.

   
  November 5, 2000 - The ground floor on the south side is in. Martin has suggested we leave the opening through to the basement so that we get lots of natural light. Looks good at this stage.  
   
  November 5, 2000 - Stairway down from the green house on the south side into the basement. Eventually this will be the way we empty the central composting toilet system that will sit here.  
   
  November 5, 2000 - Walk out on the west side with lots of windows to capture the setting sun.
   
 