Glulam Post and Beam Framing Ground Floor
Heavy duty steel is being used to brace the house for strong winds and a heavy vegetative roof. Straw bales will fill in the post and beam construction along the north portions of the house as insulation with stucco finishing. Check out a brief note on progress to this point. Click Here

   
  November 25, 2000 - Framing for the the living room on the ground floor.  
   
  November 25, 2000 - Reviewing the construction. From left to right, Colin, Hal and John.  
   
  November 25, 2000 - A view of the framing looking north west.
   
  November 25, 2000 - Looking at the newly framed ground floor from the south west looking north east. The beams are mainly Glulam constructed beams made from fast growing trees.  
 
  November 25, 2000 - From a distance the framing takes shape.  
 
   