Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Ground Floor
Extensive tubing is tied to the steel wire grid that reinforces the floor. This will provide both our heat collection and distribution. It can also provide cooling during the summer.

   
  October 16 2000 - The master bedroom looking south west into the living room (left) and kitchen (right). Here the concrete has been poured in the living room to the south while the master bedroom in the foreground awaits completion.  
   
  October 16 , 2000 - The ground floor on the east side looking west. The in-floor heating system has been covered in concrete and smooth floor remains as the final surface.  
   
  October 16 2000 - The ground floor heating tubing comes together at a distribution point.
   
 
  Copyright 2000 John Wilson