Solar Project: The Wilson House

Photo Journal Contents
Date
Description
Page
     
tkjhlkj

Steel Framing
Heavy duty steel is being used to brace the house for strong winds and a heavy vegetative roof. Straw bales will fill in the post and beam construction along the north portions of the house.

   
  November 13, 2000 - Framing around the master bedroom on the east side with steel. This was a cold and foggy morning.  
   
  November 13 , 2000 - Positioning the frame and fastening to the foundation.  
   
  November 13, 2000 - Steel framing for the west side of the house.
   
  November 13 , 2000 - Looking east as the west frame is positioned. The east frame is in position and ready for post and beam construction.  
 
   
  Copyright 2000 John Wilson